Keep your B2B sleepwear payment milestones, order changes and custom materials connected to the approved project. Sample development, purchasing, bulk production and shipment release involve different decisions. Jinshi records the agreed amounts, conditions and responsibilities in your quotation, invoice, purchase order or contract.
Bank transfer is our normal B2B payment arrangement, with other suitable methods reviewed for the order, currency and transaction conditions. Sample fees, dedicated material purchases, tooling, bulk payments and freight may have separate milestones.
| Milestone | What to identify in the project record |
|---|---|
| Sample or development payment | The style, round, deliverables, included revisions and dispatch arrangements |
| Material or tooling commitment | The approved item, purchase quantity, ownership and work authorized |
| Bulk-order payment | The order value, amount, due condition and relevant production start requirements |
| Balance or shipment payment | The inspection, document or release condition agreed for that payment |
| Credit, allowance or refund | Reason, amount, currency, applicable order and how the amount will be settled |
The actual percentages and due dates belong in the order documents. A sample-fee credit against a future order is different from a cash refund, and a remittance notice is different from confirmed receipt of funds.
Jinshi Sleepwear is our brand; the legal company name is Jiangmen Jinshi Technology Co., Ltd. The formal payment instruction identifies the relevant entity, invoice, currency and purpose. Any separately agreed collection arrangement must be documented clearly.
If account details or payment conditions change, verify the revised instruction through the established contact and a formal written record. Keep the old and new invoice references connected so your team can see which instruction applies.
Changes can involve quantity, size allocation, color, artwork, materials, fastenings, labels, packaging or destination. We first review the work already completed or committed, then identify the feasible change, cost effect, sample or test needs and revised timing.
A useful change request includes the order, affected style/color/size quantities, current specification, requested revision, reason and required decision date. The approved change should update the technical pack, bill of materials, sample reference, purchasing instructions, quality requirements and packing files where affected.
Suppose a buyer requests that 50 units change from color A to color B while keeping the order total unchanged. This is an illustrative scenario.
| Current stage | What the review needs to address |
|---|---|
| Color-specific materials not purchased | Revised allocation, supply availability, approvals and price basis |
| Color A material already purchased | Whether the material can be retained, transferred or used in another approved project; the new color's sourcing |
| Color A pieces already cut | Existing cut parts and work, additional materials and cutting, production rescheduling |
| Garments already branded and packed | Product and packaging changes, relabeling, reinspection and the practical disposition of completed goods |
Identify savings from work that can genuinely be stopped alongside any additional work. A manufacturing correction to meet the original approved specification is handled separately from a new customer design request.
Woven labels, zippers, printed fabric or gift boxes can be purchased in quantities different from the immediate garment order. Record the purchased amount, quantity used, usable balance, owner, storage arrangement and permitted next use.
Options can include an agreed reorder reserve, transfer to the buyer, use in another authorized project or documented disposal. Branded materials and customer artwork must follow the agreed confidentiality and use restrictions. Storage duration, charges and deterioration or obsolescence responsibilities need a defined basis.
Send the request promptly with the affected styles and instructions. We identify what can stop, what has already been completed and what commitments cannot be reversed. The resulting settlement considers the agreed terms, actual work, dedicated materials and services already incurred.
The close-out should cover goods, samples, technical files, patterns, tools and remaining materials, together with any balance, credit or agreed refund. A pause also needs a review date and a restart plan; the earlier production slot does not remain indefinitely available without an agreement.
We can review it. Before cutting, the implications differ from a change after size-specific panels or goods have been made. The revised mix also needs a cost, material and schedule check.
Simple changes with no new work or cost may be handled within the agreed project scope. Additional development or committed materials are assessed before implementation.
Customer branding is handled under its agreed ownership and use permissions. A leftover quantity does not create permission to reuse it for another brand.
Use the order issue process so the goods can be checked against the approved reference and the appropriate corrective responsibility determined.