Sleepwear Factory Equipment and Production Capacity

Assess the resources behind your next collection. Jinshi combines sample development, six bulk production lines and product-specific equipment with the planning needed to move an approved garment into a repeatable order.

Our manufacturing resources

Total site

Approximately 5,000 m², covering production and supporting functions

Employees

More than 120 across the business

Equipment

More than 200 items across different equipment categories

Bulk production

Six production lines

Sample development

A separate development line and a dedicated sample team

Monthly sample output

More than 100 sample styles developed

Sample-style output includes development and revision work. It describes the work of the sample operation, rather than a count of new retail designs launched each month.

Monthly Capacity and Annual Sales

150,000+ sales units per month — manufacturing capacity

2,000,000+ sales units per year — sales volume

For both figures, one individual garment counts as one sales unit, and a complete two-piece pajama set counts as one sales unit. The two garment components are tracked separately where needed for cutting, sewing and packing.

Available production time is reviewed against the current order book, product mix and material readiness. We confirm your order schedule after reviewing these conditions with you.

Match the equipment to the construction

Work areaEquipment and resource categoriesWhat the team controls
Pattern and cutting preparationDigital pattern and marker tools, spreading and cutting equipmentPattern version, size allocation, fabric direction and cut-part identification
Knit and woven sewingLockstitch, overlock, coverstitch and relevant specialist operationsSeam type, stitch formation, stretch compatibility and assembly
Closures and reinforcementButtonholes, button and snap application, bartacking and related checksOpening positions, attachment security and reinforced areas
Print and decorationDigital print, screen print, transfer and embroidery resourcesArtwork version, fabric compatibility, scale, position and color approval
FinishingWashing or finishing resources where specified, pressing and finishing stationsAgreed treatment, shape and finished appearance
Inspection and packingMeasurement and inspection stations, needle detection and relevant attachment checks, packing resourcesProduct requirements, set contents, identification and packing instructions

Our garment operation is supported by the relevant in-house and specialist partner resources. We identify the execution arrangements for fabric development, wet processing and other specialist work in the project plan.

Different garments need different production routes

Stretch-knit pajama sets

The main fabric, rib, waistband and seams need to work together. Cutting preparation, elastic seams and finishing are reviewed against the approved set, with tops and bottoms matched through packing.

Zip baby sleepers

Zipper length and tape, guards, cuffs and foot configurations are checked by size group. The sample stage establishes these details before the bulk sewing instructions are released.

Button-front and piped styles

Collars, openings, piping and directional prints need their own assembly and alignment checks. The fabric construction and garment design determine the machine setup and operation sequence.

Coordinated gift collections

Garments and accessories may follow different production routes before meeting at the packing stage. A component list and SKU plan keep the final gift-set contents consistent.

How we assess your production slot

  1. Define the order mix. Confirm styles, colors, size quantities, set contents and relevant manufacturing operations.
  1. Check material readiness. Review fabric, trims, artwork, packaging and any specialist processing.
  1. Review approval status. Identify the samples, tests or technical decisions still needed before production.
  1. Agree the schedule. Connect line availability, inspections, packing and shipment arrangements to your target date.

Normal bulk production on standard fabric qualities is 25–30 working days, after the relevant start conditions are confirmed. Reviews, special procurement and transport are scheduled separately. See lead times and scheduling.

Questions about production resources

Can a small first order use your manufacturing service?

Yes. Standard fabric qualities support 30 units per style per color, with mixed sizes. This includes developing your color or print on the established fabric quality. New material or specialist processing requirements are reviewed separately.

Is all monthly capacity available for a new order?

We review the current schedule before allocating production time. Total capacity is a business capability figure; confirmed order dates depend on the product and resources available for that project.

Can we review equipment relevant to our product?

Yes. Tell us the construction or process you want to discuss. We can arrange a technical conversation, relevant images or a factory visit.

Can an approved style be produced again?

Yes. We review the retained specification, material availability, color batches and any changes before confirming the repeat order and its schedule.

Production Resources That Support Your Collection

Sample first, then transfer the method

The separate development line gives patterns, materials and construction a dedicated review stage. Approved samples and operation details provide the reference for bulk setup.

Match the route to the garment

Pajama sets, zip sleepers and layered sacks need different combinations of operations. We review those requirements before choosing the production route and allocating time.

Connect inspection and packing

Our ten-person QA/QC team and twenty-person packing team support the finished order. The approved version, size breakdown, labels and set contents remain connected through the handover.

Share the order you are planning

Send the product types, quantities and required delivery window. We will review how the materials, operations and available schedule fit together.