Move your approved kids' sleepwear into bulk production with Jinshi, a pajama manufacturer in Jiangmen, China. Our factory coordinates materials, cutting, sewing, inspection and packing against the released product reference. Whether you are placing a first order or replenishing a collection, we connect the quantity mix, brand details and production milestones in one working plan.

Total Jiangmen site, including its different functions
All staff across the company
Equipment across different operations
Plus a separate sample-development line
Monthly production capacity
Annual sales volume
One individual garment or one complete two-piece set counts as one sales unit. Capacity, annual sales and the production quantity of your order describe different things; the actual allocation and schedule are reviewed for the project.
The sample, patterns, materials and artwork form a connected production package. The sewing team works from the released version and the instructions for each size.
Receiving, first-piece, in-process and finished-garment checks focus on the agreed product requirements. Ten QA/QC staff support our quality function; the order plan defines the actual inspection work.
Labels, folded sets, retail packaging and carton identification belong to the same order plan. A wholesale buying brief does not reduce the product to an unbranded sewing task.
The approved product and production records support later replenishment. New lots, changed trims or updated artwork are reviewed before they become substitutions.
Normal bulk production takes 25–30 working days once the required specifications, materials, approvals and payment conditions are ready as agreed. Buyer review, special sourcing, additional development and transport are separate parts of the schedule.
For standard fabric qualities, the minimum is 30 sales units per style and color, with sizes mixed within that style and color. One single garment is one unit; one complete two-piece pajama set is also one unit. Regular qualities include custom colors and prints.
| Reference | What must agree | Why it matters |
|---|---|---|
| Approved sample | Style version, material status and accepted details | Establishes the physical production reference |
| Technical pack and measurements | Construction, size chart and configurations | Defines how each size is made and checked |
| Bill of materials | Body, trims, fastenings, labels and layers | Prevents an unapproved component entering the garment |
| Color and print standards | Material quality, artwork and approved appearance | Connects visual approval to production supplies |
| Order and packing plan | Style/color quantities, size mix and sales units | Controls assortment and final identification |
If an item is unresolved, identify the work it blocks. A staged release should state its permitted scope instead of leaving the team to infer that the whole order has been approved.
Incoming fabric and trims are checked against the released specifications and references. The relevant preparation, including fabric relaxation where required by the selected quality, is planned before cutting. Unresolved material differences are raised before the affected work proceeds.
The cutting plan uses the correct size mix, grain or direction requirements and any print or pattern-matching instructions. Cut components remain identified for the style and size they belong to.
Printing or embroidery is placed at the appropriate stage for its process. Fabric printing, panel printing and decoration after assembly do not necessarily follow the same order, so the production route reflects the approved method.
The initial assembled output is compared with the reference for key dimensions, construction and component placement. In-process checks then focus on the agreed requirements as the order progresses, rather than postponing every question until packing.
Finished garments receive the agreed finishing and inspection. Approved label, folding, assortment and carton instructions guide packing, with product and quantity identification checked before dispatch preparation.
Jinshi operates six bulk-production lines and a separate sample-development line. The actual order schedule depends on the released style, material readiness and production allocation; the number of lines is not a promise that every line is assigned to one order.
Milestone updates identify what has been completed and what follows. Cut quantity, sewn quantity and packed finished quantity describe different stages of the same units and should not be added together as extra output. How we work explains the project communication approach.
If a proposed material, trim or construction differs from the released package, record the difference and its effect on the product, cost and schedule. The authorized contact reviews the required resubmission or comparison before the changed work proceeds.
An approved sample is not silently redefined to cover a new quality. The current bill of materials and relevant instructions are updated after the decision, while the previous version remains part of the history.
The agreed inspection plan defines the acceptance work. A sampling index does not state an achieved defect rate, and an inspection sample does not describe every unit as individually laboratory tested.
Packing records connect style, color, size, sales-unit quantity and carton information. Shipping arrangements and delivery timing are confirmed separately through the shipping and export route.
Cutting, sewing, finishing and packing are distinct stages with their own references and checks. The factory view helps your team understand where the chosen material, size mix and branding enter the route.
Jinshi has manufactured since 2000 and exported since 2008. A project review or factory visit can focus on your intended product, the relevant operations and the quality points that matter to the order.




A first collection and an established replenishment program need different planning emphasis. The regular-fabric policy supports an initial 30 units per style/color, while current material supply, approvals and line allocation shape each later order.
Our illustrative 50-to-150-unit reorder plan shows how a repeat request can be organized around the original product reference. The example's opening quantity is a scenario choice; it does not replace the 30-unit minimum.
Good production cooperation keeps the approved product, progress updates and packing decisions connected. We organize project communication around the stages and decisions agreed with your team, including any questions that need resolving before the next operation.
No. It begins when the relevant production readiness and payment conditions are met as agreed, not from an initial message.
No universal pilot quantity is imposed. The sample and production plan is selected for the project; a complex-development trial is not a replacement for the regular-fabric minimum policy.
Yes. The approved size mix is recorded in the order and cutting plan within that style and color.
The sequence follows the selected method. Fabric repeats, positioned panel artwork and decoration on assembled garments can require different routes.
The affected work is reviewed against the released specification. Any proposed replacement requires an identified decision and the relevant checks before use.
Send the approved style information, quantity mix and target schedule. We will review readiness, open decisions and the proposed production handoff.